Heating System Equipment
Ground-loop heat pump equipment for projects that already have the civil design, borehole plan or water-side system requirements.
Product Overview
A ground source heat pump is usually connected with a borehole, buried pipe or ground-loop design that has already been planned by the project team. The unit selection depends on loop water temperature, flow rate, pressure loss and whether anti-freeze fluid is used.
For custom or project-specific orders, clients can send drawings, target parameters, old equipment photos or a tender product list. Spruce HVAC reviews what can be supplied as standard, what should be adjusted and what needs accessory matching.

These are the product variations or selection paths clients usually review before price comparison.
Building type, operating hours, ambient condition and installation environment affect equipment selection.
Capacity, airflow, pressure, water flow, power supply and size should be reviewed according to product type.
Export packaging, delivery schedule and loading requirements should be specified before production.
Final values should be reviewed after the exact model and operating condition are clear.
| Product | Ground Source Heat Pumps |
|---|---|
| Category | Heating System Equipment |
| Typical application | Commercial buildings with planned ground-loop systems; Low-carbon heating and cooling projects; Schools, hospitals and public buildings with long operating hours |
| Customization | Size, structure, function, accessory package, control mode and packaging according to project demand. |
| MOQ | MOQ can start from 1 unit for project equipment |
| Lead time | Normally 30-60 days, depending on standard or customized configuration |
Send model, quantity, target specification and application details so Spruce HVAC can check the right configuration.
Contact Spruce HVACProduct Selection
A ground source heat pump is usually connected with a borehole, buried pipe or ground-loop design that has already been planned by the project team. The unit selection depends on loop water temperature, flow rate, pressure loss and whether anti-freeze fluid is used.
For international projects, Spruce HVAC reviews how the heat pump matches civil design, commissioning method and maintenance access.

The same product name can be used in different projects. These application areas show where this product family is commonly supplied.
Ground Source Heat Pumps is available for this application with configuration based on working condition, quantity and installation limits.
Ground Source Heat Pumps is available for this application with configuration based on working condition, quantity and installation limits.
Ground Source Heat Pumps is available for this application with configuration based on working condition, quantity and installation limits.
Spruce HVAC prepares quotation details according to product role, duty data, commercial terms and export requirements.
| Product role | Heating System Equipment; used for system support, replacement, new project supply or distributor stock. |
|---|---|
| Loop Data | Ground loop type, entering/leaving water temperature, flow rate and pressure loss. |
| Building Load | Heating load, cooling load and daily operating schedule. |
| Installation | Mechanical room layout, service clearance, power supply and pump-side plan. |
| Commercial details | MOQ can start from 1 unit for project equipment. Lead time is normally 30-60 days, depending on standard or customized configuration. Send destination market, packaging requirement and whether OEM labeling is needed. |